Packtender
Live TendersHow it worksPricingCoverageFAQ
Log in

Tenders for you

HomeTendersPricingSign In

Tenders for you

166 tenders
Sort by

Filters

Keywords

Get alerts for new matches

  • IRON SKID FOR USE OF INDIAN RAILWAYS

    Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•14 Sept 2026
  • Ministry of Railways
    Central Government•Published 15 Aug 2026
    CPPP
    ₹Not statedValue not stated•1 Oct 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•15 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•28 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPPElectrical Works & Installation
    ₹Not statedValue not stated•11 Nov 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•17 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPPHealthcare, Medical & Pharmaceuticals
    ₹Not statedValue not stated•8 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•7 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•19 Aug 2026Last day today
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•20 Aug 20261 day left
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•7 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•26 Aug 20267 days left
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•4 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•19 Aug 2026Last day today
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPPElectrical Works & Installation
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPPElectrical Works & Installation
    ₹Not statedValue not stated•2 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPPComputer Hardware & Peripherals
    ₹Not statedValue not stated•20 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•22 Aug 20263 days left
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•22 Aug 20263 days left
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•22 Aug 20263 days left
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPPElectrical Works & Installation
    ₹Not statedValue not stated•24 Aug 2026
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•4 Sept 2026
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•16 Sept 2026
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•23 Sept 2026
  • Ministry of Railways
    Central Government•Published 1 Aug 2026
    CPPP
    ₹Not statedValue not stated•15 Sept 2026
  • Ministry of Railways
    Central Government•Published 25 Jul 2026
    CPPPCivil & Construction Works
    ₹Not statedValue not stated•20 Aug 2026
  • Ministry of Railways
    Central Government•Published 25 Jul 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 25 Jul 2026
    CPPP
    ₹Not statedValue not stated•28 Oct 2026
  • Ministry of Railways
    Central Government•Published 18 Jul 2026
    CPPP
    ₹Not statedValue not stated•21 Aug 20262 days left
  • Ministry of Railways
    Central Government•Published 18 Jul 2026
    CPPPElectrical Works & Installation
    ₹Not statedValue not stated•3 Sept 2026
  • Ministry of Railways
    Central Government•Published 18 Jul 2026
    CPPPChemicals & Industrial Materials
    ₹Not statedValue not stated•27 Aug 2026
  • Ministry of Railways
    Central Government•Published 18 Jul 2026
    CPPP
    ₹Not statedValue not stated•30 Nov 2026
  • Ministry of Railways
    Central Government•Published 11 Jul 2026
    CPPPChemicals & Industrial Materials
    ₹Not statedValue not stated•25 Aug 2026
  • Ministry of Road Transport and Highways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•21 Sept 2026
  • Ministry of Railways
    Central Government•Published 15 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 15 Aug 2026
    CPPP
    ₹Not statedValue not stated•1 Oct 2026
  • Ministry of Railways
    Central Government•Published 15 Aug 2026
    CPPP
    ₹Not statedValue not stated•8 Sept 2026
  • Ministry of Railways
    Central Government•Published 15 Aug 2026
    CPPP
    ₹Not statedValue not stated•4 Sept 2026
  • Ministry of Railways
    Central Government•Published 15 Aug 2026
    CPPPMachinery, Tools, Spares & Fabrication
    ₹Not statedValue not stated•1 Oct 2026
  • Ministry of Railways - World Bank Tenders
    Central Government•Published 12 Aug 2026
    CPPP
    ₹Not statedValue not stated•21 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•10 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•5 Oct 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•29 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPPComputer Hardware & Peripherals
    ₹Not statedValue not stated•24 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•2 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•2 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•2 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•28 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•7 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•28 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•28 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•28 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•28 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•27 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•5 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•28 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPPElectrical Works & Installation
    ₹Not statedValue not stated•24 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPPChemicals & Industrial Materials
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•28 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPPChemicals & Industrial Materials
    ₹Not statedValue not stated•24 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPPMachinery, Tools, Spares & Fabrication
    ₹Not statedValue not stated•7 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•21 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•19 Aug 2026Last day today
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•14 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPPMachinery, Tools, Spares & Fabrication
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•31 Aug 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•19 Aug 2026Last day today
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•24 Aug 20265 days left
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•8 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•3 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•21 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•7 Sept 2026
  • Ministry of Railways
    Central Government•Published 8 Aug 2026
    CPPP
    ₹Not statedValue not stated•6 Oct 2026
1 day left
5 days left
1 day left
6 days left
5 days left
5 days left
5 days left
SET OF DPT AND MPT KITS
ASSEMBLY OF CENTRAL COUPLER ABC (NEW) for KSR. Drawing No:- EP/DGA-12/M alt. (1) & Corrigendum-1 NW/BDA-8002/M
SEAL KIT COMPLETE FOR HYDRAULIC ROOF L [ SEAL KIT COMPLETE FOR HYDRAULIC ROOF LIFT CYLINDER TO RWF DRAWING NO.721200120030.NOTE:1)ONE SET CONSISTING OF ITEM NO.1 TO 6 AND QUANTITY AS PER B.O.M.2)MATERIAL:VITON.]
Construction of New BG Double Line from Kharsia (Km 0.00) to Balodabazar (Km 110.500) and Y-connectivity from Jharadih including earthwork in formation, bridges, ROR (Rail Over Rail), ROB (Road Over Bridge), RUB (Road Under Bridge), service buildings, staff quarters, P-Way works (including supply of Ballast, P-way material exept Rail), Electrification (2x25 KV OHE, PSI, PLC & Electrical General work), and Signalling & Telecommunication works, along with allied and associated miscellan
SET OF HIGH PRESSURE RUBBER HOSE
Local Purchase of Medicines, Surgical Items and Consumables by entering into rate contract with vendors i.e. firms / distributors / chemist shops/ retail shops /Authorized stockiest on the basis of discounts offered by vendors located inMunicipal limits of Yamuna Nagar and Jagadhri, for supply on day-to-day requirement basis at Northern Railway, Extra Divisional Hospital, Jagadhri workshop for a period of two years.
Supply , installation & commissioning of pressure gauge calibration test bench along with master pressure gauge 01 no & accessories as per attached specification
INJ PEMBROLIZUMAB 100 MG [Product should be available in the Manufacturing firms approvedproduct list of Railway Board ] AI 26-27
SET OF TABLE PLATES FOR L2CCEA
Tab/Cap Venetoclaxc 100 mg, (Pack of 28 Tabs/Caps) Rate to be quoted per pack basis [Product should be available in the Manufacturing firm s approved product list of Railway Board]Item Code No.: M251036 , AI 26-27
Paint Gentian Blue to RAL-5010. Material Spec.- IS:8662/2004(Reaffirmed 2019) with additional requirement of ICF/MD/Spec.-045, issue status-02, Rev-3 along with RDSO Amendment No.1 (Revision-0) for pigment content or latest. (with latest revision amendment)
Polyurethane Top Coat Signal Red to ISC 537 of IS: 5/2007 with latest revision and amendment. Mat. Spec: RDSO Spec. No. RDSO/M&C/PCN/100/2024 with latest revision and amendment.
Supply, Installation and commissioning of Portable Co-ordinate measuring machine and all the concomitant accessories. details are attached in Technical Specification and Terms & Conditions
One Rake set of Axle box front cover for VB/TS
Execution of balance ancillary works of 132 KV transmission line and 132 KV switchyard of Bebejia, Boko and Goalpara Transmission line
ADJUSTER NUT CONFIRMING TO RDSO SPEC . No. 07-ABR-1992 AMENDMENT No.5 OF SEPT-2016 TO RDSO DRG.NO.WD-82064-S-02 RC, ITEM-2 ALT.7.
LEADER NUT FLANGE CONFORMING TO RDSO SPEC. No. 07-ABR-1992 AMENDMENT No. 5 of Sept. 2016. TO RDSO WD-82064-S-05 RC ITEM-1 ALT.7.
Design, Supply, Erection, Testing and Commissioning of 01 no New 25 KV, 50 Hz, AC SP and modification of existing 25 kV, 50 Hz AC TSS at Mahoba in connection with Jhansi-Khairar and Chord Line at Mahoba and Khairar project in Jhansi Division of North Central Railway.
BOTTOM COVER WITH QUICK RELEASE VALVE CONFORMING TO APPENDIX A1 OF RDSO SPEC. NO. 02- ABR-02, AMENDMENT No.-4 of SEPT. 2016 to ESCORTS & KNORR BREMSE, DRG NO: ESCORTS PART NO 202 OR KNORR BREMSE PART NO KD- 202, ALT: NIL.
HQ_MED_Drugs_ZRC_Zonal Rate Contract for supply of (PH NO.: 10018) 30 Percent NEUTRAL INSULIN + 70 Percent ISOPHANE INSULIN 100 IU/ML - 3 ML CARTRIDGES (1 PEN FREE FOR EVERY 30 CARTRIDGES)
Set of Hex. Socket HD Cap Screws.
Adjusting Shim for Lateral Bump Stop of Fiat Bogie etc.
LATERAL BUMP STOP FOR FIAT BOGIE OF LHB COACHES
set of Digital Wheel Wear Gauges for WDG
Supply of Single core cable, 35 sq.mm
Set of insulating base for WAG-9 Loco
Repair & Maintenance of Pump-motor sets of different make and capacities with operation of pump set under the jurisdiction of SSE/Elect/P/IC/KNE & SSE/Elect/P/IC/BOE for the duration of two (02) years.
At NJP:- Maintenance of electrical assets of Running room NJP & HDB under the jurisdiction of SSE/Elect/P/IC/NJP for a period of two years.
At NJP:- Repair & Maintenance of Pump-motor sets of different make and capacities with operation of pump set at Mahananda pump house and Filter house at NJP for the duration of two (02) years.
SUPPLY OF BIG WINDOW LOUVER SHUTTER ASSEMBLY
Civil Engineering works in connection to Yard remodeling for increasing the CSL of 2nd UP loop & Provision of shunting neck to avoid shunting in main line & Provision of a crossover from DN to UP for direct reception in UP second loop with UP second loop as common loop at MANPUR station under Gati Shakti Unit of DDU Division under CAO/Con/RSP/MHX.
Replacement of over aged/defective S&T gears (Relays, LEDs, VDUs, EKTs, cables etc.) over ADSTE/North Jurisdiction of TPJ Division
Reliability improvement by Provision of Dual Detection of Track circuit with Axle counter at MRA & RRU stations under Sr DSTE/ML/JHS
Comprehensive Annual Maintenance Contract for M/s. Sukhila make IntegratedPower Supply (IPS) installations over Tiruchchirappalli Division for a period of Three(03) Years
Comprehensive Annual Maintenance Contract for Diesel run Generator setsin Signaling department over TPJ division for a period of two years
ROTARY SWITCH FOR BATTERY 100 AMPS.ON-OFF, 4 POSITION AC/DC TYPE KAYCEE- C1023.
SEALING WIRE OF SOFT MILD STEEL WIRE GALVD. OF 0.9 MM DIA (20 SWG) HAVING SOFT MILD STEEL WIRE OF 0.45 MM DIA (26 SWG) WRAPED AROUND IT WITH 4 TO 5 TURNS PER CENTIMETRE LENGTH OF THE 0.9 MM DIA WIRE THE FINISHED SEALING WIRE TO BE SUPPLIED IN COILS OF 10 CMS DIA OF 1 KG WEIGHT EACH IS: 280/2006 (Reaffirmed in 2021) Warranty Period : 30 months from the date of delivery.
Reflector for 2 feet tube light fitting with suitable screw. One set consists of 01 No. of item No. 4 and 06 Nos. of item No. 20 as per drawing Drg. No CC76236 item No. 4 and 20 or latest.
SILICON CARBIDE WATER PROOF PAPER IN SIZE OF 230mmX280 mm or 297 mm X210 mm
Dismantling and reconstruction of existing 3.05 M wide SPAN-1 (22.872 Meters) of North Foot Over Bridge (FOB) connecting Platforms No. 1, 2 & 3 at Visakhapatnam Railway Station under the Jurisdiction of the Senior Divisional Engineer (HQ), Visakhapatnam, South Coast Railway.
Balance Pway work/Track work of ANG yard, Chitali yard, Yeola yard and Manmad Entry Arrangement Line (ROR Line) including Manmad yard in connection with DD-MMR Doubling project.
PVC jumper wire single core 0.6mm dia annealed Tinned copper conductor PVC insulated unsheathed cable as per IRS:S-76/89 AMnd.3 with latest amendment.Quantity to be supplied 60 Percent Blue & 40 Percent Grey of tender quantity with 100 mtr. coil. Spec:
Set of 01 Half Face Piece Reusable Respirator
Supply installation and commissioning of INDUCTION HEATER 40KVA.
Set of P.U Paints for touch up for WAG-9 [Set of P.U Paints for touch up for WAG-9HC Twin (EF12K) as per Drg.No. NIL specn: M&C/PCN/100/2018 or Latest & M&C/PCN/110/2020 (Rev.1.0) or Latest.]
Spring Washer A16 for Schaku Coupler of EMU Coaches
Set of adhesives for gluing of balancing weights to LHB wheels for dynamic Balancing consisting of 3 items: 1.Loctite SF 7075-Primer activator 100 ML-06 Nos 2.Loctite AA324-Structural adhesive 250 ML-02 Nos 3.Loctite SF79040-Chisel gasket remover 510 gm-01 No Spec: Technical specification for Dynamic wheel balancing of wheel set for balancing procedure. Dte.09.01.06 page-02 of 03. procedure of rectification of wheel set imbalance: item no.6
Construction of Cement Concrete road of 2 lane with paved shoulder configuration from Km. 168.180 Shitala Mata Mandir to Km 168.920 Railway Crossing Total Length - 740 m on Bhandara-Khat-Ghotitok Road NH-247 in the state of Maharashtra
ROD PRIMARY INTERLOCK (MODIFIED)
GEAR CASE OIL
Clip for 15 mm bore pipe to drg. no. SKT-2009/99/C Alt-1.
Brake Pull Rod Safety Loo
SOLID MIG/MAG WELDING FILLER WIRE
MRVC/W/401
PVC INSULATED CABLE FOR RAILWAY SIGNALLING SIZE 2 CORE X 2.5 SQMM
Key Bolt with Nut, Spring Washer & 4 dia. Split Pin
LUB OIL FILTER
Adapter Retainer Bolt with Lock Nut
FLANGE CARTRIDGE BLOCK
HEAVY DUTY PNEUMATIC CYLINDER
ROLLER POLYURETHANE
HYDRAULIC PILOT OPERATED CHECK VALVE
STAINLESS STEEL QUICK COUPLER
1 PITCH SPROCKET ITEM NO.5
SPROCKET ITEM NO.3
WATER HOSE THERMOPLASTIC SYNTHETIC
CUSHION RUBBER FOR TRCC
FILTER BAG (I/D 144 MM X 5040 MM LONG)
PU based top
MOTOR PROTECTION CIRCUIT BREAKER
WIRE BRUSH 300X 43 mm
MOTOR PROTECTION CIRCUIT BREAKER
GRID SPRING FOR BIBBY RESILIENT
2HP, 6 pole, 100L Sq cage induction mot [2HP, 6 pole, 100L Sq cage induction motor.
Hanger inside assembly
SUPPORT PAD
KNUCKLE 3/4 SIZE
6 KW, 3 phase station lighting control panel (63A) with all necessary accessories
BRUSHES PAINT AND VARNISH FLAT
Slack Adjuster Complete Type IRSA-750 for BCN wagons .
Impregnating varnish .
Clevis (for brakes) assembly with MN steel bush
WELDING PIN
Outer Spring.
UNDER FRAME (EMU C HC)
BUFFER SPINDLE with Hex. NUT
VERTICAL DAMPER FOR SECONDARY AIR SPRING SUSPENSION ARRANGEMENT
Insert for Wheel Turning Lathe LNUX 301940 TN 2000 (WIDIA) or LNUX 301940 PRGC 4025 (SANDVIK) Coated.
GEAR OIL
COUPLER HOOK END Drawing No: WA/BD-3000, alt. (nil)
RUBBER PACKING RING FOR AXLE BOX GUIDE ARRANGEMENT
AXLE END CAP SCREW
ROLLER BLIND
Inj. Bevacizumab 100 mg, minimum 04 ml [ITEM CODE M261703] specn: [ITEM CODE M261703]
Steel Shots to IS 4606 - 1983
Hot Finish Seamless Tube (HFS)
NYLOCK NUT M20
PVC INSULATED CABLE FOR RAILWAY SIGNALLING SIZE 30 CORE X 1.5 SQ.MM
Lavatory Air Exhauster